Welcome to the official page for the latest updates on Xavier University's exciting new Residence Hall and Parking Garage project. Here, you can find up-to-the-minute information about the construction progress, 重要的会议, 停车安排. Feel free to bookmark this page for easy access to the latest developments.

校园地图

e世博esball的愿景揭晓:e世博esball南校区停车的未来

Xavier University is in the beginning stages of the development of our cutting-edge multi-storey 停车 garage at Xavier South. Witness the transformation of or urban landscapes as we redefine convenience, 效率, 社会和谐.

This innovative structure isn't just about 停车 – it's a solution designed to alleviate street traffic and 停车 challenges. Picture a seamlessly integrated system that not only optimizes space but also minimizes disruptions to our valued neighbors.

社区更新

notice-under-construction-tape-sign-yellow-instagram-post-1.png

2024年3月20日

On April 1st, 2024, we will begin moving cranes and heavy loads on campus at the construction site. 在这些活动中,安全是最重要的, and we urge everyone to remain vigilant and adhere to safety protocols at all times. Signage has been placed throughout the construction site to alert you to potential hazards. Please respect these warnings and exercise caution when near construction areas. Please refrain from walking or driving through the construction site as trucks move in and out, 因为它带来了风险. Additionally, please stay informed about any street closures or detours related to the construction. 我们感谢您的耐心,因为我们正在努力改善校园设施. 你们在优先考虑安全方面的合作至关重要. 如果您有任何问题或疑虑, 请不要犹豫,通过建设info@XULA与我们联系.或1-504-520-3200感谢您的理解和支持.

2024年2月20日

为兴建停车库而封闭迪西昂街公告

This notice is to inform you about an upcoming street closure that will impact our campus community. 迪克森街的一段. 从3月1日到7月14日将停止通行吗. 在此期间,进入迪克森街的特定路段. 将受到限制.

虽然我们认识到这可能会带来一些不便, please understand that this measure is essential for the advancement of the construction project. For a detailed understanding of the affected area, please refer to the attached map.

如果您有任何问题或疑虑, do not hesitate to reach out to me at constructioninfo@XULA.edu 或致电504-520-7395.

We appreciate your understanding and cooperation during this construction phase. Your safety and the successful completion of this project is our top priorities.

停车-garage-dixon-street-closure-1.png

停车-garage-dixon-street-closure-2.png

停车-garage-dixon-street-closure-3.png

2024年2月6日

F停车场部分停车场关闭

Important update regarding partial 停车 lane closures in Parking Lot F, 特别是在毗邻S Genois St的地区, 迪克森圣, 及南克拉克街.

从本周五开始, 2月9日, the first three lanes within Parking Lot F will be closed off until the summer. This closure is necessary to facilitate construction work in the vicinity. As a result, those three lanes will be unavailable for use from 2月9日 onwards.

确保安全,有效管理施工区域, 在指定的禁区周围将设置围栏. Please be mindful of this fencing and cooperate with any additional instructions or signage that may be in place. 

如果你对这个建设项目有任何疑问, 噪音水平, 或相关事宜, 请随时联系我 constructioninfo@XULA.edu 或致电504-520-7395.

parking.png

10/26

10/7周

  •  Multivista将执行最后的内部调查.

10/2周

  • Multivista will complete the second round of photo documenting property interiors as requested by neighbors.
  • Multivista will hand-deliver letters one last time for request of interior surveys.

9/25周

  • Multivista will perform a second round of photo documenting property interiors as requested by neighbors.

9/18周

9/11周:

  •  Multivista will perform the first round of photo documenting property interiors as requested by neighbors.
  •  Multivista将继续进行外部调查.

9/4周:

  •  Lemoine/Multivista will hand-deliver letters to residence and begin taking calls.
  •  Multivista will begin photo documenting the exteriors of Xavier’s buildings and surrounding neighborhood. 

 

社区调查地图
 

额外的信息

Auger Cast-in Place Piles (ACIP) will be used for building the Dormitory instead of driving piles. ACIPs are constructed by first drilling into the soil and then pouring concrete once the desired depth is reached and causes minimal vibrations. 振动监测最初将作为预防措施使用.

建设 workers will be prohibited from 停车 in the surrounding neighborhood outside of the project site. 建设 workers will park in Xavier’s Gert Town 停车 lot at the corner of Stroelitz Street and Pine Street and will be shuttled to and from the project site. (如有更改)

新的停车场将提供额外的停车位, which is an increase in the number of 停车 spaces available currently.

The contractor will be limited to working within normal business hours, which are from 7am to 5pm.

Xavier’s operational plan for the existing dormitories will be implemented for the new dormitory.

e世博esball正在和承包商一起确定关闭点. 目前只计划对公用事业连接造成轻微干扰.

Yes, sidewalks and street 停车 around the project site will be closed for the duration of the project.

学校的弧
谢谢您的耐心和理解
谢谢您的耐心和理解 as we work to improve our campus facilities and provide enhanced living and 停车 options for the Xavier University community. 非常感谢您的支持与合作. Stay tuned to this page for the latest updates and announcements regarding the new Residence Hall and Parking Garage project.